5 weeks to go!! hard to believe we are this close…
- New gate line and posts to provide more turn-in space
- Front ready for gate cladding and turf
- giant gate frame
- New Laurels to the side plus other bits
- Right rear side before cleanup
- Right rear sideafter cleanup and getting ready for raised veg beds
- Left side before hedges
- New laurels down left side
- Back left before planting
- back left after laurels and thinking about a few other bits
- utility/boiler room
- Patio paving – at last!!
- Utility room tiling
- Dressing room
- Master bathroom
- Garden “canvas” – lots of ideas for this space
- Rear garden ready for turfing with paving and veg beds
- Most of the tiling now done in master bathroom
- Vanity unit going in
- Sliding frosted door to master bath from dressing room
- Dressing room
- Downstairs loo feature wall tiling